- Joined
- Feb 17, 2007
- Messages
- 6,210
- Car(s)
- E39 M5, '94 Cadillac Fleetwood, '21 Focus Wagon
Regarding that "Construction will be done by xxxx":
2km outside of my town there is an double-intersection (2 within 25m) with quite a lot traffic. A sign sitting there since march claims "we're redesigning these intersections and it will be done by november 2011". Guess what, not even started yet.
Oh and btw: Regarding the weather, I hope your tents are waterproof. At least if the summer keeps being the way it is right now .
2km outside of my town there is an double-intersection (2 within 25m) with quite a lot traffic. A sign sitting there since march claims "we're redesigning these intersections and it will be done by november 2011". Guess what, not even started yet.
Oh and btw: Regarding the weather, I hope your tents are waterproof. At least if the summer keeps being the way it is right now .
Last edited: