BerserkerCatSplat
Hormone Induced
Quick picture of the interior progress:
The car has the (fairly rare) power window option, and after some quick testing we have determined that all four window motors are stone-dead. Replacing those will have to happen before we make any more progress on the interior, fortunately Chrysler used the same basic motor design for decades, so we can buy $50 rebuilt motors from Rockauto instead of $250 NOS units and just swap some brackets over.
The car has the (fairly rare) power window option, and after some quick testing we have determined that all four window motors are stone-dead. Replacing those will have to happen before we make any more progress on the interior, fortunately Chrysler used the same basic motor design for decades, so we can buy $50 rebuilt motors from Rockauto instead of $250 NOS units and just swap some brackets over.